Thermal energy

agap2 is positioned on four activities that enable us to help our customers in all the phases of their projects.

agap2 expertise

  • agap2 teams are positioned on four activities that enable us to help our customers in all the phases of their construction or renovation/repowering projects for fossil fuelled electricity power stations.

  • We are also working on general flame power station projects (coal, gas, fuel, etc.) in France and in other countries.

Areas of expertise

Services

  • Basic and detailed design work in all sectors (Mechanical engineering, Process, Electricity HV/LV, Instrumentation, Pipe systems, Boilermaking, Civil Engineering, etc.)
  • Electrical Balance Of Plant (E-BOP) studies
  • Mechanical engineering Balance Of Plant (M-BOP) studies
  • Drafting of specifications and data sheets
  • Fluids mechanics
  • Technical project management / Coordination of technical interfaces
  • Plant and process safety studies
  • Maintenance of equipment (revolving machines, electrical stations, etc.)

References and technical expertise

  • Civil Engineering studies and commenting of reinforced concrete design notes (piles, pads, longitudinal beams, bottom slabs, etc.) and metal structures on various CCPP plants, in design construction (Bouchain, Blénod, Martigues)
  • Interchangeability studies for steam turbine bodies between various power stations in France
  • Maintenance studies for steam turbine rotors installed in French fossil fuelled power plants
  • Design of tubular heat exchangers
  • Improvement of an active fumes recovery and treatment system
  • Electrical wiring and connections study for all equipment in a general specification CCPP (cabinets, terminal bars, wiring harness, etc.)

Services

  • Bulk purchasing
  • Expediting
  • QA/QC inspection
  • Transport and logistics
  • Project and supplier quality
  • Technical inspection of Materials and Equipment
  • Audits

References and technical expertise

  • General purchasing management on scheduled or unscheduled maintenance on French fossil fuelled power plants
  • Purchasing management for project and amendments on the construction of the Martigues CCPP
  • Purchasing management for project on the construction of new fossil fuelled plants in French overseas departments and territories and in Corsica
  • Purchasing of forged parts, welded assemblies and castings for equipment production (pumps, exchangers, turbines, compressors, etc.)
  • Management of claims/disputes relating to the construction of a CCPP
  • Management of all transport/logistics phases for water treatment equipment in fossil fuelled plants

Services

  • Supervision on Site
  • General installation
  • Pre-commissioning, Commissioning for all sectors
  • Testing and Validation of equipment
  • Field QHSE for power plants

References and technical expertise

  • Technical coordination for the repowering of the Martigues CCPP
  • Documentary management of the various operational unit renovation projects in French power plants
  • Quality/Cost/Delivery dates project management and supervision of sub-contractors’ contracts on the overall engineering for a new CCPP
  • Overall costing of a renovation project for all the pumps in the Cordemais and Le Havre power plants
  • Overall project management for the supply of all the effluent treatment systems for an operational fossil fuelled power plant
  • Technical coordination of the contracts for the various lots (condenser, turbine, instrumentation/electricity), for the design/construction of a new CCPP

Services

  • Project management
  • Risk management
  • Cost Control
  • Quotes and costing
  • Scheduling
  • Contract Management / Claim Management
  • Management of documentary control
  • QHSE system management

References and technical expertise

  • Project management for the manufacturing of process water treatment systems (reinjection into wells) installed onboard an FPSO
  • Project technical coordination for various interfaces (civil engineering, EIA, framework, equipment) for the creation of a PSP in France
  • Construction and scheduling control for a water production station for the cooling of a CCPP
  • Progress and expenditure monitoring for the Qatar Umm Bab project and work site

Quality policy

They trust us

  • agap2_logo-client_cnim_680x628.jpg
  • agap2_logo-client_engie_reseaux_680x628.jpg
  • agap2_logo-client_dalkia_680x628.jpg
  • agap2_logo-client_tractebel_680x628.jpg