
Involvement throughout the entire project lifecycle
Multi-disciplinary technical expertise applied to gas solutions
Ensuring performance, safety, and standards
Context and key issues
agap2 supports Storengy on the biogas project in Pau-Lescar. This project notably involves the construction of methanization and methanation units to produce up to 13,000 MWh/year of biomethane. We are involved in conducting catalytic methanation process studies to capture and valorize the CO2 emitted by the wastewater treatment plant (WWTP) and produce synthetic methane.
Verification and analysis of deliverables such as PFDs, P&IDs, ATEX zoning, ITPs, alarm tables, exchange tables, functional analyses, implementation schedules, etc.
Development of specifications, supplier monitoring, and technical coordination between suppliers and specialized engineers (mechanical, electrical, instrumentation)
Development of detailed operating instructions, including equipment shutdown and startup procedures
Preparation of inspection and control plans
Development of the FMEA with the client to define the spare parts list
Preparation, execution, and validation of FAT/SAT
Ensuring equipment performance and process integration
Smooth coordination between stakeholders
Deadline management and supplier contractual commitments
Optimization of plant operability and maintainability
Discover other high-stakes assignments where our expertise in engineering, project management, quality, or supply chain has enabled us to turn constraints into concrete results.