CFO/CFA detailed design studies for a complex hospital project

Expertise areas activated
CFO/CFA detailed design studies for a complex hospital project
Engineering
Key information

CFO/CFA electrical detailed design studies for a University Hospital

Direct involvement in the core of the MOEx mission, closely linked to the construction site

Extensive expertise in hospital technical constraints

Context and key issues

As part of the construction of the new Nantes University Hospital, agap2 is supporting EDEIS in its construction management (MOEx) mission. The objective is to ensure the robustness of the CFO/CFA detailed design studies to guarantee the compliance, reliability, and coordination of electrical installations in a hospital environment.

Contact us

agap2 assignments

Construction and Civil Engineering

Conducting CFO/CFA detailed design studies


Preparation of plans, diagrams, and calculation notes


Verification of technical and regulatory compliance


Coordination with construction teams and the project management team (MOE)


Integration of specific hospital constraints


Technical assistance during the execution phase

Bénéfices clients

Ensuring the technical reliability of electrical installations


Minimizing error risks during the construction phase


Compliance with hospital and regulatory requirements


Seamless communication between design and construction

Ensuring timely execution