Multi-system electrical BIM modeling for a complex industrial project
Key interface between design, construction, and on-site teams
Direct support for execution and commissioning
Context and key issues
As part of the construction of the IP13 incineration plant for Syctom, carried out by the VESA consortium (Vinci Energies and Fayat Energie), the Electricity & Energy package represented a major stake, with an investment of several hundred million euros. agap2 was involved on the construction side to ensure BIM continuity between the design and construction phases, interfacing with contractors and on-site teams, to guarantee compliant routing of installations, reliable documentation, and smooth management of interfaces.
Full BIM modeling of HV/LV cables, safety, instrumentation, and control systems
Creation, updating, and structuring of specifications in various technical rooms.
Design of support structures (Revit + AutoCAD) and production of the support schedule for site distribution.
BIM interface between design and construction
Operational support for the deployment of cable trays, pulling, and connections.
Commissioning preparation
Ensured BIM continuity between design and construction, reducing on-site inconsistencies.
Improved documentation quality and secured distribution materials for construction teams.
Accelerated routing and better anticipation of site constraints.
Contribution to smoother commissioning thanks to structured VM preparation.